« Are you getting logged out of Vault and possibly locked out of Windows? | Main | How To... Change The Location Of The Indexes »

October 11, 2010

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a01156eaaf373970c0134881a8cc2970c

Listed below are links to weblogs that reference How To... Write the Vault Document Revision Back To An Inventor File:

Comments

Misterd

Hello, do you have good tips and tricks regarding the use of the revision table and Vault Workgroup? Because, if you forget to unchecked the option "Update Property on Revision Number Edit" when you place the revision table in Inventor, the revision number of the last line of the revision table will follow the iProperty. Then the last line show you revision B with a comment of the revision A... A little bit confusing...

Thanks in advance.

Richard Rankin

Hi MisterD,
This sort of How-To question is maybe best asked in the Vault Forums. The posts on this blog are as a result of questions posed to Autodesk Support from support cases. Maybe this is one also for the "Under the Hood" blog that deals mostly with workflows.

Buy Online Rx

i started out, mostly interested in staying warm, as the rented rooms i stayed in that winter had no heat, nor electricity, except hot water to the bath tub and one outlet near where i spread a sleeping bag and blankets on the floor. i slept in wool socks and a wool watch cap and insulated underwear, and by the time i toweled from bathing, i was red like a lobster from the cold.

The comments to this entry are closed.

RSS Feed

  • Subscribe
Bookmark and Share

August 2014

Sun Mon Tue Wed Thu Fri Sat
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31